OUR HOUSE – MARCH 2013
Framing continued in March, and very quickly. The curved glu-lam beams that were made especially to a certain shape for our particular ceiling were installed. In this instance the roof was built from the inside out – the beams were set, then the finish tongue and groove doug fir boards, then in later months insulation, waterproofing and finally a metal standing seam roofing material were added.
The bedrooms really start to take shape, and the greatroom also. The last photo is of the house near the end of the month – really starting to look like we might live there at some point!