OUR HOUSE – LOWER LEVEL – FEBRUARY 2013
At the same time as framing was happening upstairs, construction of the downstairs continued. Bathroom 3 began to take shape, the walls of Bedroom 3 were framed, and the stairs became stairs! The area to the right of the stairs (when going down them) presented itself as a design challenge to resolve.
Two walls in Bedroom 3 have concrete as their finished wall surface. It was hard to appreciate how great they would look until framing began.
Also included are a few photos of the house from the rear, both looking up and an overview from a short distance. A lot happened in February!