OUR HOUSE – AUGUST 2013
The driveway was installed in August, as well as the concrete porch that wraps around the front portion of the house leading up the front door. Also on the exterior, the eucalyptus leaf imprints in the back pathway turned out really nicely.
Inside the Kitchen cabinetry arrived and was installed. Templates were made for the stone countertops. A series of elm planks reclaimed from a barn were used to clad the front and one side of the Kitchen island.
The bathroom vanity cabinets were hung – a photo of the rift cut white oak vanity in the master bathroom is shown here. Finish work happened in the master bedroom – white oak planks cover the headboard wall.