OUR HOUSE – MAY 2013

 

In May we were ready to have the interior concrete floors poured.  This took several pours on different days.  These photos are from those different days.  It was interesting to see how many people were required to pull of such a feat!  A steel plate had already been installed to cover the thickness of the floor from the lower level to the upper level, and also the steel posts of the future glass railing were installed a head of time.  A challenge was to get the concrete to butt up neatly and tightly to the steel.  Definitely a case of something a lot easier to acccomplish than it actually is.  Solid Concrete did a stellar job on this complicated installation.