OUR HOUSE – JUNE 2013
In June the interior work focus was on finalizing sheetrock installation, trimming out windows and doors and working on the flush base detail. Tiling began in the three bathrooms. We added a niche last minute to Bathroom 3 which was definitely a good call.
Waterproofing on the exterior was covered with finish materials – a lot of the cedar siding was installed this month. Exterior trim began and this was a big job for sure. The stucco on the entry facade was done and came out brighter white than we expected. Now we needed a porch and a whole lot more interior work!