OUR HOUSE – NOVEMBER 2012

 

In November 2012 concrete work continued. More house walls, two sets of landscaping stairs, and the start of the landscaping bench. A lot of digging up of where the upper level foundation walls are to go. The weather was favorable, always a help. Bob is standing in the downstairs bedroom, the window openings beyond him are in the downstairs bathroom wall. The overview shot shows why we love the lot so much – lovely view of treetops and the coastal range. That photo also shows how by the end of the month, the wood forms for the upper level foundation walls were pretty much in place.